CDC logoSafer Healthier People  CDC HomeCDC SearchCDC Health Topics A-Z
NIOSH - National Institute for Occupational Safety and Health

Skip navigation links Search NIOSH  |  NIOSH Home  |  NIOSH Topics  |  Site Index  |  Databases and Information Resources  |  NIOSH Products  |  Contact Us

Search for NIOSH Publications: NIOSHTIC-2

NIOSHTIC-2 Search Results

      Advanced Search  |  Help  |  About  |  Feedback 
Terms: 20028612 1 - 1 of 1 Bibliographic entries All record(s) shown.
Save All   |   Save Page View Saved    |    Download
Select check boxes to automatically save entries, or use 'save all' or 'save page' links above.

 1 Ground control for highwall mining in the United States
Authors Zipf-RK; Mark-C 
Source Int J Surface Min Reclam Environ 2005 Sep; 19(3):188-217 
Link http://dx.doi.org/10.1080/13895260500165353 
NIOSHTIC No. 20028612 
AbstractHighwall mining is an important coal mining method in the United States and may account for approximately 4% of total U.S. coal production. Highwall stability is the major ground control-related safety concern in highwall mining. Engineering away the safety risk by decreasing the highwall slope angle may be the best solution to the hazard posed by vertical joints in highwalls. The Mine Safety and Health Administration requires a ground control plan that usually specifies the hole width, maximum hole depth, maximum overburden depth, seam thickness, web pillar width, barrier pillar width, and number of holes between barriers. Design charts for these parameters are given. Web pillars containing preexisting auger holes are analyzed, and a design chart for estimating their minimum width is also presented. Close-proximity multiple-split highwall mining, which caused several serious highwall failures, is analyzed and recommendations are made. Finally, this study examined records from 5,289 highwall miner holes with a total completed hole length of 2.56 million ft to understand the reasons for early pullout. Average loss was almost 20% of planned hole length, and only 35% of the holes reached the planned depth. 
KeywordsGround-control; Coal-mining; Safety-research; Injuries; Hazards; Highwall-mining; Slope-stability; Pillar-design; Geology; Rock-falls; Surface-mining; Geophysics; Accidents; Accident-statistics; Models 
Page 1 of 1
All record(s) shown.